Pool tile and coping replacement in Pinecrest, FL

Waterline tile and coping wear out with the plaster, tile falls away, coping chips and cracks. The best time to replace them is while the pool is drained for a resurface, and we quote the tile and coping work with the resurface.

Tile and coping, done while the pool is drained

Replacing tile and coping on their own means draining the pool a second time. Done with a resurface, the pool is already empty, the crew is already there, and the tile, coping and new finish go in as one job.

  • Waterline tile replaced while the pool is empty
  • Coping (the edge stones around the pool) replaced at the same time
  • Doing it with the resurface saves a second drain and a second job
  • Tile and coping are quoted with the resurface, in writing, after the inspection

What it costs

Tile and coping are quoted with your resurface, the price depends on the tile you choose, how much coping needs replacing, and the condition underneath. We quote it in writing after we inspect and measure the pool, so the number you get is for your pool.

How long does it take?

A typical pool takes 4 to 7 working days from drain to refill. Here is the process, step by step.

  1. Inspect and measure

    We visit your home, measure the pool, check the shell, tile, coping and deck, and look at the water chemistry.

  2. Drain and chip out

    The pool is drained and the old finish is chipped out to the shell. Nothing gets skimmed over.

  3. Shell repair and bond coat

    Cracks and hollow spots are repaired, then a bond coat is applied so the new finish holds.

  4. Apply the finish

    White plaster, quartz or pebble is applied, along with any tile and coping work.

  5. Refill and startup chemistry

    The pool is refilled and the startup chemistry is set and balanced. We tell you when it is safe to swim.

Pool Resurfacing Pinecrest is proud to serve Florida

Why choose Pool Resurfacing Pinecrest?

Resurfacing only, done properly

We do pool resurfacing only. That focus means every job gets a careful inspection, a full chip out, shell repairs where they are needed, and a finish applied the right way.

A written price after measuring

We inspect and measure the pool before we quote, so the price you get in writing is for your pool, not a guess from a phone call.

Permits handled for you

Pool work often needs a permit from your village or city and an inspection by the county. We prepare the paperwork and meet the inspector as part of the job.

Licensed work, CPC

Florida requires pool resurfacing to be carried out by a Certified Pool/Spa Contractor (CPC). Our resurfacing work is carried out under a CPC license. Ask any pool company you hire to show its license before you sign.

Contact us today for a free estimate

Call 786-589-9026 or request a free estimate. No obligation.

Call 786-589-9026

Free, no obligation

Get a free estimateCall